|
Measure C Bond Modernization Program
Marin County voters came out in droves to support Measure C in the November election. The $249.5 million bond for facilities maintenance, job training and safety passed with more than 60 percent of the vote, easily surpassing the required 55 percent. Measure C Bond ( PDF Document 81 Kb). Measure C Bond submitted to voters ( PDF Document 364 Kb)
With the bond, the College will be able to:
- Modernize science labs, classrooms, libraries;
- Provide modern computer technology;
- Upgrade fire safety, campus security, disabled access, energy conservation systems and electrical wiring for computer technology; and
- Repair, construct, acquire, and/or equip classrooms, labs, sites and facilities.
The College of Marin board of trustees passed a resolution in July 2004 adopting green building principles, which will govern all future construction at the college including projects funded by the bond. *( PDF Document 3.42 Mb).
More Information:
Questions and comments may be submitted to: Elizabeth Bornstein (formerly Tucker), Swinerton Management & Consulting, Inc.
College of Marin (mailing address)
P.O. Box 144003
Kentfield, CA 94914.4003
College of Marin (physical address)
835 College Ave, Building MS-3
Kentfield, CA 94904
415.884.3139 phone / 415.721.7039 fax
 |
* These files require Adobe Acrobat Reader which you may download for free from Adobe's web site. |
 |
|