|

COM Diamond Physical Education Center Modernization, Ground Breaking Ceremony
About Measure C
Marin County voters came out in droves to support Measure C in the November 2004 election. The $249.5 million bond for facilities maintenance, job training and safety passed with more than 60 percent of the vote, easily surpassing the required 55 percent.
Measure C Bond–Full Text ( PDF Document 81 Kb)
Measure C Bond Submitted to Voters ( PDF Document 364 Kb)
With the bond, the College will be able to:
- Modernize science labs, classrooms, libraries;
- Provide modern computer technology;
- Upgrade fire safety, campus security, disabled access, energy conservation systems and electrical wiring for computer technology; and
- Repair, construct, acquire, and/or equip classrooms, labs, sites and facilities.
The College of Marin Board of Trustees passed a resolution in July 2004 adopting green building principles, which governs all construction at the college including projects funded by the bond. *( PDF Document 3.42 Mb).
Program and District Contacts
 |
* These files require Adobe Acrobat Reader which you may download for free from Adobe's web site. |
 |
Facilities Modernization web page
Technical Contact: Maridel Barr, (415) 485-9518
Content Responsible: Laura McCarty, Director of Modernization, (415) 485-9343
|